|
|
Fastener
Equipment Upgrades
|
|
|
|
National
750-5 Die S1
|
Central location for all pneumatic valves, safety lockout,
air combination unit, PDI pressure switches with lighted
plug in cable and lubrication pump and filter.
|
Machine ready for shipment after run off has been completed
by the customer to their satisfaction using all the secondary
equipment and platforms supplied by them.
|
|
|
Rear of panel shows a farval metering oil system which
is supplied from the filter side of the flood system and
feeds the front liners and top caps in conjunction with
the flood as a safety backup using a low pressure switch.
|
| NEXT
PAGE | HOME |
|
|
|
|
|
|
|
|